Skip to content

Katja Windt Dissertation Writing

Mathias Knollmann (Dr., Dipl.-Wirtsch.-Ing.)

Former Research Associate and Ph.D. Student

Production & Logistics Networks Workgroup

School of Engineering and Science
Jacobs University Bremen gGmbH

Street Address: Campus Ring 1 | 28759 Bremen | Germany
Mailing Address: P.O. Box 750 561 | 28725 Bremen | Germany
Phone: +49 421 200-3475
Fax: +49 421 200-3078
E-mail: m.knollmann@jacobs-university.de
Office: South Hall, Room 122

Curriculum Vitae

Professional experience
Oct 2010 – May 2015
Research Associate in the Production & Logistics Networks Workgroup of Prof. Dr. oec. J. Bendul at Jacobs University.
Aug 2010 – Sep 2010Graduate Assistant at the Institute for Factory Facilities and Logistics (IFA) in Hannover.
Feb 2010 – Mai 2010Diploma Thesis at Volkswagen AG in Wolfsburg.
Aug 2009 – Feb 2010Internship at Volkswagen AG in Wolfsburg.
Jan 2009 – Sep 2009Student Assistant at the Institute for Factory Facilities and Logistics (IFA) in Hannover.
Nov 2008Internship at MTU Maintenance in Hannover.
Apr 2008 – Sep 2008Student Assistant at the Institute for Controlling in Hannover.
Educational background
Jun 2010 – July 2010Language Study Travel in Antigua (Guatemala).
Oct 2005 – Mai 2010Study of Mechanical Engineering and Management Science (Diplom- Wirtschaftsingenieur) at the Leibniz University Hannover.

Publications

2016

  • J. Bendul and M. Knollmann, “The Lead Time Syndrome of Manufacturing Control: Comparison of Two Independent Research Approaches.” 2016, pp. 81-86, Research and Innovation in Manufacturing: Key Enabling Technologies for the Factories of the Future – Proceedings of the 48th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • N. Duffie, J. Bendul, K. Windt, and M. Knollmann, “Lead time instability and its mitigation in production work systems,” CIRP Annals – Manufacturing Technology, vol. 65, iss. 1, pp. 437-440, 2016.
    [Bibtex]

2015

  • M. Knollmann and J. C. Bendul, “The human factor in production planning and control: Considering human needs in computer aided decision-support systems,” International Journal of Manufacturing Technology and Management, vol. 30, pp. 346-368, 2015.
    [Bibtex]
  • J. C. Bendul, M. Knollmann, and N. Duffie, The Lead Time Syndrome of manufacturing control: comparison of two independent research approaches , Under review, 2015.
    [Bibtex]

2014

  • K. Windt and M. Knollmann, “Consequences of planned lead time adaptions in scope of the lead time syndrome of production control,” CIRP Annals – Manufacturing Technology, vol. 63, iss. 1, pp. 405-408, 2014.
    [Bibtex]
  • M. Knollmann, K. Windt, and N. Duffie, “Evaluation of Capacity Control and Planned Lead Time Control in a Control-theoretic Model,” Procedia CIRP, vol. 17, pp. 392-397, 2014, Variety Management in Manufacturing Proceedings of the 47th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • M. Knollmann, “Logistic Target Achievement In Scope Of The Lead Time Syndrome Of Manufacturing Control: Validation Of The Syndrome And Development Of A Methodology To Avoid It In Practice,” PhD Thesis, Jacobs University Bremen, Bremen, 2014.
    [Bibtex]

2013

  • M. Knollmann and K. Windt, “Exploitation of Due Date Reliability Potentials: Mathematical Investigation of the Lead Time Syndrome,” in Dynamics in Logistics, 2013, pp. 313-325.
    [Bibtex]
  • M. Knollmann and K. Windt, “Control-theoretic Analysis of the Lead Time Syndrome and its Impact on the Logistic Target Achievement,” Procedia CIRP, vol. 7, pp. 97-102, 2013, Forty Sixth CIRP Conference on Manufacturing Systems 2013.
    [Bibtex]
  • M. Knollmann and K. Windt, “Evaluating Lead Time Standard Deviation with Regard to the Lead Time Syndrome,” in Robust Manufacturing Control – Proceedings of the CIRP Sponsored Conference RoMaC 2012, Bremen, Germany, 18th-20th June 2012, 2013, pp. 469-480.
    [Bibtex]

2011

  • K. Windt, M. Knollmann, and M. Meyer, “Anwendung von Data Mining Methoden zur Wissensgenerierung in der Logistik-Kritische Reflexion der Analysefähigkeit zur Termintreueverbesserung.” 2011, pp. 223-249.
    [Bibtex]

All publications of the Production & Logistics Networks Workgroup

Prof. Dr.-Ing. Katja Windt

President and CEO
Bernd Rogge Professor of Global Production Logistics

School of Engineering and Science
Jacobs University Bremen gGmbH

Street Address: Campus Ring 1 | 28759 Bremen | Germany
Mailing Address: P.O. Box 750 561 | 28725 Bremen | Germany
Phone: +49 421 200-3478
Fax: +49 421 200-3078
E-mail: k.windt@jacobs-university.de
Office: South Hall, Room 139

Curriculum Vitae

Professional experience
Dec 2009 – presentFull Professor of Global Production Logistics
Jacobs University Bremen gGmbH
Feb 2008 – Nov 2009Associate Professor of Global Production Logistics
Jacobs University Bremen gGmbH
Jan 2004 – Jun 2012Part-project leader in the Collaborative Research Center (CRC 637) “Autonomous Logistics”,
University of Bremen
Jan 2006 – Nov 2007Member of International Graduate School for Dynamics in Logistics, University of Bremen
Apr 2001 – Nov 2007Planning and Control of Production Technical Systems, BIBA
Post doctoral research assistant, departmental manager:
“Intelligent Planning and Control Methods for Logistics Systems”
Doctorate
Jun 1995 – Jun 2000Institute of Production Systems and Logistics (IFA)
Leibniz University of Hanover, Doctorate
Study period
Oct 1988 – Apr 1995Leibniz University of Hanover
Course of Study: Mechanical Engineering,
Specialization: Production Technology
Diploma in April 1995
Studies abroad
Apr 1994 – Jul 1994Babcock Wanson S.A.,Groupe Babcock Entreprise
Nérac, France
Apr 1992 – Sep 1992Massachusetts Institute of Technology
Cambridge, USA
Memberships
▪ Die Junge Akademie
▪     Jul 2004 – Jul 2009: Member
▪     Jul 2005 – Jun 2007: Board
▪     Jul 2006 – Jun 2007: Speaker
▪ Member of supervisory board of Deutsche Post AG
▪ Member of supervisory board of Fraport AG
▪ Member of the board of trustees of Körber Stiftung (Deutscher Studienpreis)
▪ Member of the executive board of Bundesvereinigung Logistik (BVL) e.V.
▪ Member of advisory board of BLG Logistics Group AG & Co. KG
▪ Member of Academic Society for Work and Industrial Organization (HAB Seminar)
▪ Member of acatech Deutsche Akademie der Technikwissenschaften▪ MINT ambassador
Awards
“Professor of the Year 2009” award by the German Association of University Professors and Lecturers
Alfried Krupp Prize for Young University Teachers 2008
Burbridge-Award for the Best Paper, IFIP WG 5.7 Conference in Ascona, 18.09.1997

Publications

2016

  • N. Duffie, J. Bendul, K. Windt, and M. Knollmann, “Lead time instability and its mitigation in production work systems,” CIRP Annals – Manufacturing Technology, vol. 65, iss. 1, pp. 437-440, 2016.
    [Bibtex]

2014

  • K. Windt and M. Knollmann, “Consequences of planned lead time adaptions in scope of the lead time syndrome of production control,” CIRP Annals – Manufacturing Technology, vol. 63, iss. 1, pp. 405-408, 2014.
    [Bibtex]
  • T. Becker, M. Meyer, and K. Windt, “A manufacturing systems network model for the evaluation of complex manufacturing systems,” International Journal of Productivity and Performance Management, vol. 63, iss. 3, pp. 324-340, 2014.
    [Bibtex]
  • M. Meyer, A. Brintrup, and K. Windt, “Linking Product and Machine Network Structure Using Nested Pattern Analysis,” Procedia CIRP, vol. 17, pp. 278-283, 2014, Variety Management in Manufacturing Proceedings of the 47th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • H. Blunck, V. Vican, T. Becker, and K. Windt, “Improvement Heuristics for Manufacturing System Design Using Complex Network Figures,” Procedia CIRP, vol. 17, pp. 50-55, 2014, Variety Management in Manufacturing – Proceedings of the 47th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • M. Knollmann, K. Windt, and N. Duffie, “Evaluation of Capacity Control and Planned Lead Time Control in a Control-theoretic Model,” Procedia CIRP, vol. 17, pp. 392-397, 2014, Variety Management in Manufacturing Proceedings of the 47th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • V. Vican, H. Blunck, and K. Windt, “Die neuen Zielgrößen moderner Produktionsplanungs und -steuerungssysteme – ein Beitrag zu aktuellen Forschungsfragen,” in Produzieren in Deutschland — Wettbewerbsfähigkeit im 21. Jahrhundert, 1st ed., H. Lödding and A. Friedewald, Eds., GITO Verlag, 2014, pp. 167-184.
    [Bibtex]
  • S. M. Chankov, T. Becker, and K. Windt, “Towards Definition of Synchronization in Logistics Systems,” Procedia CIRP, vol. 17, pp. 594-599, 2014, Variety Management in ManufacturingProceedings of the 47th CIRP Conference on Manufacturing Systems.
    [Bibtex]

2013

  • T. Becker, M. Meyer, and K. Windt, “A network theory approach for robustness measurement in dynamic manufacturing systems,” in The Annual Cambridge International Manufacturing Symposium – Disruptive supply network models in future industrial systems: configuring for resilience and sustainability, 2013.
    [Bibtex]
  • T. Becker, M. Meyer, M. E. Beber, K. Windt, and M. Hütt, “A Comparison of Network Characteristics in Metabolic and Manufacturing Systems,” in Dynamics in Logistics, H. Kreowski, B. Scholz-Reiter, and K. Thoben, Eds., Springer Berlin Heidelberg, 2013, pp. 141-150.
    [Bibtex]
  • H. Blunck and K. Windt, “Komplexität schafft Spielraum für Selbststeuerung,” wt-online 2-2013 Sonderheft Industrie 4.0, vol. 2, pp. 109-113, 2013.
    [Bibtex]
  • M. Knollmann and K. Windt, “Exploitation of Due Date Reliability Potentials: Mathematical Investigation of the Lead Time Syndrome,” in Dynamics in Logistics, 2013, pp. 313-325.
    [Bibtex]
  • M. Meyer, M. Apostu, and K. Windt, “Analyzing the Influence of Capacity Adjustments on Performance Robustness in Dynamic Job-shop Environments,” Procedia CIRP, vol. 7, pp. 449-454, 2013, Forty Sixth CIRP Conference on Manufacturing Systems 2013.
    [Bibtex]
  • M. Monauni, M. Meyer, and K. Windt, “Evaluation Model for Robustness and Efficiency Trade-offs in Production Capacity Decisions,” in Robust Manufacturing Control – Proceedings of the CIRP Sponsored Conference RoMaC 2012, Bremen, Germany, 18th-20th June 2012, K. Windt, Ed., Berlin Heidelberg: Springer Berlin Heidelberg, 2013.
    [Bibtex]
  • T. Becker, S. M. Chankov, and K. Windt, “Synchronization Measures in Job Shop Manufacturing Environments,” Procedia CIRP, vol. 7, pp. 157-162, 2013, Forty Sixth CIRP Conference on Manufacturing Systems 2013.
    [Bibtex]
  • M. Knollmann and K. Windt, “Control-theoretic Analysis of the Lead Time Syndrome and its Impact on the Logistic Target Achievement,” Procedia CIRP, vol. 7, pp. 97-102, 2013, Forty Sixth CIRP Conference on Manufacturing Systems 2013.
    [Bibtex]
  • M. Knollmann and K. Windt, “Evaluating Lead Time Standard Deviation with Regard to the Lead Time Syndrome,” in Robust Manufacturing Control – Proceedings of the CIRP Sponsored Conference RoMaC 2012, Bremen, Germany, 18th-20th June 2012, 2013, pp. 469-480.
    [Bibtex]
  • K. Windt, Von globalen Herausforderungen zu operativen Lösungen für die Logistik der Zukunft Dortmunder Gespräche, Dortmund: , Zukunftsplenum, Zukunftskongress Logistik – 31, 03 September 2013, 2013.
    [Bibtex]
  • K. Windt, Bremen,Germany: , Bremer Logistiktag, BVL, Kostensenkung in Wertschöpfungsketten, 23./24. April 2013, Bremen, Germany, Prozessoptimierung im Automotive-Bereich, 2013.
    [Bibtex]

2012

  • T. Becker, M. E. Beber, K. Windt, and M. Hütt, “The impact of network connectivity on performance in production logistic networks,” CIRP Journal of Manufacturing Science and Technology, vol. 5, iss. 4, pp. 309-318, 2012, Special issue from 44th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • O. Jeken, N. Duffie, K. Windt, H. Blunck, A. Chehade, and H. Rekersbrink, “Dynamics of autonomously acting products and work systems in production and assembly,” CIRP Journal of Manufacturing Science and Technology, vol. 5, iss. 4, pp. 267-275, 2012, Special issue from 44th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • M. Iber and K. Windt, “Order Related Acoustic Characterization of Production Data,” , pp. 17-31, 2012.
    [Bibtex]
  • T. Becker, M. E. Beber, K. Windt, and M. Hütt, “The impact of network connectivity on performance in production logistic networks,” CIRP Journal of Manufacturing Science and Technology, vol. 5, iss. 4, pp. 309-318, 2012, Special issue from 44th CIRP Conference on Manufacturing Systems.
    [Bibtex]
  • M. Iber, J. Klein, and K. Windt, “Grooving Factory. Logistische Analyse aus dem Klanglabor,” in Das geschulte Ohr: Eine Kulturgeschichte der Sonifikation, A. Vollmar and A. Schoon, Eds., , 2012, pp. 147-162.
    [Bibtex]
  • K. Windt, P. Nyhuis, and O. Herr, “Exploring Effects of Sequencing Modes towards Logistics Target Achievement on the Example of Steel Production,” Procedia CIRP, vol. 3, pp. 620-625, 2012, 45th CIRP Conference on Manufacturing Systems 2012.
    [Bibtex]
  • K. Windt, “Lecture Notes in Production Engineering: Robust Manufacturing Control,” in Autonomous Cooperation and Control in Logistics, Berlin Heidelberg: Springer, 2012.
    [Bibtex]
  • M. Knollamnn, M. Meyer, and K. Windt, “Data Mining Methoden in der Produktionslogistik,” Industrie Management, vol. 28, iss. 3, pp. 51-55, 2012.
    [Bibtex]
  • K. Windt, Large-scale comparison of manufacturing systems in industrial production and metabolic systems in biological cells Hong Kong, China: , 62nd CIRP General Assembly, 19-25 August, 2015, 2012.
    [Bibtex]
  • K. Windt, Autonomously Controlled Product Manufacturing Utilizing Flexible Order Allocation BVL, Hamburg, Germany: , 6th International Scientific Symposium on Logistics, 13-14 June 2012, 2012.
    [Bibtex]
  • K. Windt, Zukunftsweisende Konzepte des Logistikcontrollings Hamburg, Germany: , 02. February 2012, 2012.
    [Bibtex]
  • K. Windt, Logistische Regelung zum Umgang mit Störgrößen auf dem Karriereweg von Frauen Hannover, Germany: , Gastrede zum Jahresempfang des Deutschen Juristinnenbund, 16 February 2012, 2012.
    [Bibtex]

2011

  • K. Windt and M. Hütt, “Exploring due date reliability in production systems using data mining methods adapted from gene expression analysis,” CIRP Annals – Manufacturing Technology, vol. 60, iss. 1, pp. 473-476, 2011.
    [Bibtex]
  • T. Becker, M. E. Beber, K. Windt, M. Hütt, and D. Helbing, “Flow control by periodic devices: a unifying language for the description of traffic, production, and metabolic systems,” Journal of Statistical Mechanics: Theory and Experiment, vol. 60, iss. 05, 2011.
    [Bibtex]
  • B. Scholz-Reiter, K. Windt, and H. Liu, “A multiple-logistic-objective-optimized manufacturing planning and control system,” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, vol. 225, iss. 4, pp. 599-610, 2011.
    [Bibtex]
  • T. Becker, M. E. Beber, K. Windt, and M. -T. Hütt, “Flow control in production logistic networks,” in Proceedings of the 44th CIRP International Conference on Manufacturing Systems, 2011.
    [Bibtex]
  • T. Becker and K. Windt, “A Comparative View on Existing Autonomous Control Approaches: Observations from a Simulation Study,” in Autonomous Cooperation and Control in Logistics, M. Hülsmann, B. Scholz-Reiter, and K. Windt, Eds., Springer Berlin Heidelberg, 2011, pp. 275-289.
    [Bibtex]
  • N. Gebhardt, O. Jeken, and K. Windt, “Exploitation of Manufacturing Flexibilities in Decision Methods for Autonomous Control of Production Processes: Findings from Industrial Practice and Theoretical Analysis,” in Autonomous Cooperation and Control in Logistics, M. Hülsmann, B. Scholz-Reiter, and K. Windt, Eds., Springer Berlin Heidelberg, 2011, pp. 169-187.
    [Bibtex]
  • O. Jeken, N. A. Duffie, K. Windt, and H. Rekersbrink, “Dynamics of Autonomously-Acting Parts and Work Systems in Production and Assembly,” in Proc. of 44th CIRP International Conference on Manufacturing Systems, 2011.
    [Bibtex]
  • M. Meyer and K. Windt, “Lean um jeden Preis? – Interdisziplinäre Methoden als Lösungsansätze für den Positionierungskonflikt zwischen Effizienz und Robustheit,” in Deutscher Logistik-Kongress, 2011, pp. 175-198, 19-21 Oktober 2011, Berlin, Germany.
    [Bibtex]
  • K. Windt and M. Hütt, “Exploring due date reliability in production systems using data mining methods adapted from gene expression analysis,” CIRP Annals – Manufacturing Technology, vol. 60, iss. 1, pp. 473-476, 2011.
    [Bibtex]
  • K. Windt, M. Knollmann, and M. Meyer, “Anwendung von Data Mining Methoden zur Wissensgenerierung in der Logistik-Kritische Reflexion der Analysefähigkeit zur Termintreueverbesserung.” 2011, pp. 223-249.
    [Bibtex]
  • K. Windt, P. Nyhuis, I. Kolev, N. Gebhardt, J. Eilmann, P. Fronia, and S. Bertsch, “Improving Due Date Reliability of Steel Mills – Identification of Punctuality Potentials,” in Innovation in Product and Production, 2011.
    [Bibtex]
  • K. Windt, M. Hütt, and M. Meyer, “A Modeling Approach to Analyze Redundancy in Manufacturing Systems,” in Enabling Manufacturing Competitiveness and Economic Sustainability – Proceedings of the 4th International Conference on Changeable, Agile, Reconfigurable and Virtual production (CARV2011), Montreal, Canada, 2-5 October 2011, Montreal, Canada, 2011, pp. 493-498.
    [Bibtex]
  • P. Nyphius, K. Windt, S. Beck, S. Bertsch, J. Eilmann, O. Herr, I. Kolev, and Jeken, “Logistic Decoupling as a Measure for Increasing Delivery Performance of a Multi-Variant Series Production.” 2011, 21st International Conference on Production Research (ICPR 2011), July 31-August 4, 2011.
    [Bibtex]
  • M. E. Beber, K. Windt, and M. Hütt, “Punctuality in Metabolic Systems,” , Stuttgart, 2011, 21st International Conference on Production Research (ICPR 2011), July 31 – August 4, 2011.
    [Bibtex]
  • M. Hülsmann, C. Illigen, K. Windt, and O. Jeken, “Finding a Generic Algorithm for Integrating Value-Based Objectives and Logistics Goals – Operationalisation of Order Prioritising in Production Control Based on Customer Value Management,” in Proceedings of 16th International Symposium on Logistics (ISL 2011), 2011, pp. 373-381.
    [Bibtex]
  • B. Scholz-Reiter, K. Windt, and H. Liu, “A Preliminary Investigation on a Bottleneck Concept in Manufacturing Control,” in Dynamics in Logistics – Second International Conference, LDIC 2009, Bremen, Germany, August 2009, Proceedings, 2011, pp. 213-223.
    [Bibtex]
  • O. Jeken and K. Windt, “Selbststeuernder Produktaufbauzyklus – Einsatz von Selbststeuerung zur Erschließung von Flexibilitätspotenzialen in Fertigung und Montage,” Industrie Management, vol. 27, iss. 3, pp. 49-52, 2011.
    [Bibtex]
  • K. Windt and T. Geyer, “Interdisziplinäre und internationale Qualifizierung von Wissenschaftlern in Deutschland – In der Jungen Akademie und an der Jacobs University Bremen,” in Wie willkommen ist der Nachwuchs?, UBK, Konstanz, 2011, pp. 147-162.
    [Bibtex]
  • K. Windt, M. Meyer, and W. Busch, “Potentiale zur Verbesserung von Sicherheits- und Logistikprozessen im internationalen Seecontainerverkehr durch indikative Telematiklösungen.” 2011, pp. 143-151, 16. Magdeburger Logistiktage "Sichere und nachhaltige Logistik", 29 June – 01 July 2011.
    [Bibtex]
  • K. Windt, Achieving High Punctuality in Production Networks Stuttgart, Germany: , Session at the 21st International Conference on Production Research (ICPR21), 31 July-04 August 2011, 2011.
    [Bibtex]
  • K. Windt, Forum Industrie: Ruhrindustrie reloaded – iPott, Stahl und junge Könner Essen, Germany: , Im Rahmen der Veranstaltung "Phönix fliegt!", 20 December 2011, 2011.
    [Bibtex]
  • K. Windt, Interdisziplinarität am Beispiel von Produktionslogistik und Systembiologie Bremen, Germany: , Leibnitz-Doktorandenforum: "Trans- und Interdisziplinarität in der Wissenschaft", 05 October 2011, 2011.
    [Bibtex]
  • K. Windt, Produzieren in Ungleichgewichtszuständen Hannover, Germany: , Vollmer & Scheffczyk Lager, 16 September 2011, 2011.
    [Bibtex]
  • K. Windt, Selbststeuerung in der Logistik – Theoretische Erkenntnisse und Perspektiven für die Praxis Bremen, Germany: , Treffen der BVL Regionalgruppe Weser/Ems: "Innovationen in der Logistik – Ideen aus Bremen", 03 March 2011, 2011.
    [Bibtex]
  • K. Windt, Investigating Flow Control by Periodic Devices: a Unified Model for Traffic, Production, and Metabolic Systems Paris, France: , CIRP January Meetings 2011, 26-28 January 2011, 2011.
    [Bibtex]

2010

  • B. Scholz-Reiter, K. Windt, and H. Liu, “Modelling Dynamic Bottlenecks in Production Networks,” , vol. 66, pp. 1445-1463, 2010.
    [Bibtex]
  • K. Windt, T. Becker, O. Jeken, and A. Gelessus, “A classification pattern for autonomous control methods in logistics,” Logistics Research, vol. 2, iss. 2, pp. 109-120, 2010.
    [Bibtex]
  • K. Windt and M. -T. Hütt, “Graph coloring dynamics: A simple model scenario for distributed decisions in production logistics,” CIRP Annals – Manufacturing Technology, vol. 59, iss. 1, pp. 461-464, 2010.
    [Bibtex]
  • K. Windt, T. Philipp, F. Böse, and T. Becker, “Application of a three-component evaluation system for autonomous control in logistics,” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, vol. 224, iss. 8, pp. 1267-1276, 2010.
    [Bibtex]
  • K. Windt, B. Scholz-Reiter, and H. Liu, “A Robust Multiple Logistic Objectives-oriented Manufacturing Control,” in Proceedings of the 43th CIRP International Conference on Manufacturing Systems (ICMS_10), University of Technology, Austria, 2010, 2010, pp. 1017-1027.
    [Bibtex]
  • K. A. Hribernik, C. Pille, O. Jeken, K. Thoben, K. Windt, and M. Busse, “Autonomous Control of Intelligent Products in Beginning of Life Processes,” in Proceedings of the 7th International Conference on Product Lifecycle Management, 2010.
    [Bibtex]
  • M. Hülsmann, K. Windt, C. Illigen, and O. Jeken, “Value based order prioritizing in production control : Integrating customer value management into the logistics goal-setting,” in Proceedings of the 15th International Symposium on Logistics (ISL 2010), 2010, pp. 250-258.
    [Bibtex]
  • K. Windt, T. Becker, O. Jeken, and A. Gelessus, “A classification pattern for autonomous control methods in logistics,” Logistics Research, vol. 2, iss. 2, pp. 109-120, 2010.
    [Bibtex]
  • K. Windt, T. Becker, D. Asenov, and F. Arbabzadah, “A generic implementation approach of autonomous control methods in production logistics,” in Control and Automation (ICCA), 2010 8th IEEE International Conference on, 2010, pp. 629-633.
    [Bibtex]